RECONSTRUCTION OF BRIDGE OVER THE VUOKSA RIVER

Reconstruction of the bridge over the Vuoksa River regarding the project.
The motor road from Saint-Petersburg through Priozersk, Sortavala to Petrozavodsk, including the constructed section from Saint Petersburg Ring Road through Skotnoe to Magistralnaya motor road at the section km 57+550- km 81+000, Leningrad Region.

.

CLIENT

Sevzapupravtodor

GENERAL CONTRACTOR

JSC VAD

DESIGN STAGE

Design documentation: 2011 – 2012
Working documentation: 2014

CONSTRUCTION STAGE

2014 — 2015

SCOPE OF WORK

development of architectural solutions;
designing of main structures (design documentation and working documentation);
designing of technology of construction;
designing of SAC&D (design documentation and working documentation).

TECHNICAL FEATURES

bridge diagram (for each direction) — 1 x 73.0 m;
bridge length —28 m;
bridge roadway overall dimension — 2(Г-9)+2х5 m;
total weight of steel (superstructures) — 850 tonnes;
reinforced concrete slab of superstructures — 260.2+252.3=512.5 m³;
total volume of reinforced concrete — 593.8 m³.