MOTORWAY “ADLER DETOUR”

The above motorway should be that new link from Kudepsta District up to Visokoye District which helps us to ease congested traffic situation of Adler City network as well as to increase tourist flow to the popular southern city and makes more comfort to local inhabitants.
This construction site is located within Adler area of Sochi, Krasnodarski Krai. Aforementioned road starts from the intersection of A-147 Federal Highway “Djubga – Sochi- border with Abkhazia within Kudepsta District. The final point is the intersection of A-149 Adler – Krasnaya Polyana –  Visokoye District.

Construction Stages:
Stage I. Transportation junction with Federal Motorway 149 Adler – Krasnaya Polyana.
Stage II. Transportation junction with Federal Motorway 147.
Stage III. Motorway tunnel construction.
Stage IV. Main stage of construction.

.

CLIENT

Federal Enterprise “Russian Highways”

GENERAL CONTRACTOR

Avtodor Ltd.

DESIGN STAGE

2024

CONSTRUCTION STAGE

2024  – 2026 

SCOPE OF WORKS

Stage DD:
general design
design and survey works
development of DD

TECHNICAL FEATURES

type of construction – new construction
road of 1-st class (Russian Standards)
designated speed -120 km/h
total length without junctions  – 8.2 km
roadway width 2 x 7.0 m
lanes quantity – 4 pcs

Artificial structures within the road construction site:
Transportation junctions – 2 pcs
“Djubga – Sochi- Kudepsta”
“Adler – Krasnaya Polyana – Visokoe”
Bridge crossing structures – 1.34 km (3 pairs of bridges, pier’s height starts from 9 up to 40 meters.
Type of foundation – piled foundation.
Twin tunnels with a length of about 6. 1 km should be arranges via Tunneling Mechanized Complex.
Water-flow tubes Ø1.5 m – 5 pcs with a length of 225 meters.

Leave a Comment

Your email address will not be published. Required fields are marked *