BRIDGE OVER THE SVIYAGA RIVER

Bridge crossing over the Sviyaga River is being conceived as a part of  М-12 Highway ‘Moscow– Nizhny Novgorod – Kazan’, Stage VII 586 –663 km in Chuvash Republic, Tatarstan. The above structure is being installed within intersection of А-151 Federal Highway ‘Civilsk – Ulyanovsk’ up to the subsequent Highway Р-241 ‘Kazan – Buinsk – Ulyanovsk’ Stage VII.III started from Bolshie Kaybitsy Settlement up to Federal Highway Р-241.
The bridge over the Sviyaga River within the Federal high-speed Highway M-12 “Moscow – Nizhny Novgorod – Kazan”. It connects the Kaibitsky, Apastovsky and Verkhneuslonsky Districts of Tatarstan.

.

CLIENT

Federal Enterprise ‘Аvtodor’

GENERAL CONTRACTOR

‘Volgogradstroy Ltd’

DESIGN STAGE

2020 – 2023   

CONSTRUCTION STAGE

2021  – 2024  

SCOPE OF WORK

Stage DD:
bridge design development
traffic management design
utility lines rearrangement
external illumination design, power supply, drainage, navigation lights arrangement, including transportation safety measures
linear structures design
construction arrangement design
measures against karst factors
environment protection measures
fire safety measures
structural monitoring per construction stage
monitoring performance during service stage
estimate development.

Stage WD:
technical supervision

TECHNICAL FEATURES

bridge schema: 6х84.0 m
length of the bridge: 517.2 m
clearance: 2(Г-10.5)
lanes quantity: 4 pcs