MOTORWAY TUNNEL, VLADIVOSTOK CITY

Motorway tunnel is a part of the bridge crossing over the Golden Horn Bay in Vladivostok on the way connecting the federal road M-60 «Ussuri — Khabarovsk-Vladivostok” with Russki Island”.

.

CLIENTS

Department of transportation of Primorskiy Kray

DESIGN STAGE

2008

CONSTRUCTIONN STAGE

2009

SCOPE OF WORK

Stage DD:design development;
work technology design;
estimation calculation.
Stage WD:general design;
estimation calculation.

TECHNICAL FEATURES

tunnel length L=249.5 m;
number of lanes 2 х 3.50 m;
emergency lanes – per 1.0 m in each direction;
pedestrian lane — 0.75 m;
tunnel dimension — 5.4 m;
area of tunnel — 4,490.5 m2;
volume of RC – 1,7193.2 m3;
type of rebar — A-I 72.9 tons ; A-III 1,247.7 tons.

Leave a Comment

Your email address will not be published. Required fields are marked *