TRAFFIC INTERCHANGE IN NOVOSIBIRSK CITY, RUSSIA

Traffic Interchange at the Intersection of Bolshevistskaya Street, Krasny Prospect of Kamensky Highway and Fabrichnaya Street in the City of Novosibirsk.

.

General Designer

JSC “Sibgiprotrans”

GENERAL CONTRACTOR

JSC “Sibmost”

DESIGN STAGE

2010 — 2012

CONSTRUCTIONN STAGE

2010 – 2013

SCOPE OF WORK

Stage ‘Work documentation’:design of superstructure of overpass
design of SAC&D

TECHNICAL FEATURES

overpass superstructure length — 348.8 m (along the axis of the overpass)
overpass diagram: 39+45+42+3х45+48+39 m
clear headway of bridge includes six traffic lanes (per three lanes in each direction)
dividing strip of the width of 3 m
operating aisle 0.75 m
continuous beam superstructure with orthotropic carriageway slab, consisting of 6 twin steel
beams of the height of 1.78 m in cross section is located on the curve of the radius of 500 m and
transition curves
intermediate piers are located at right angles to the flyover axis

Leave a Comment

Your email address will not be published. Required fields are marked *