TUNNEL UNDER THE SIMFEROPOL HIGHWAY, NEAR MKAD TO THE SOLNTSEVO − BUTOVO − VARSHAVSKOE SHOSSE, SOUTHEASTERN CHORD, MOSCOW

Tunnel under Simferopol highway, on the section from MKAD to the Solntsevo – Butovo – Varshavskoe highway, South-Eastern Highway, Moscow

.

CLIENT

Moscow Federal Enterprise
“Department of Road & Bridge Construction”

GENERAL DESIGNER

SC “МISК”

DESIGN STAGE

2021-2022

CONSTRUCTION STAGE

2024

SCOPE OF WORKS

design of territory;
engineering survey;
stage of DD fulfillment;
expertise supervision;
stage of WD fulfillment
technical supervision.

TECHNICAL FEATURES

total length of Southeastern Chord – 128.08 m, including:
      – ramp section – 24.467 m
      – closed section – 81.05 m
      – ramp section – 22.564 m
carriageway width – 13.25 m per each direction
lanes quantity – 3 pcs per each direction
total lane width – 35.82 m
site area – 4,587.8 m2
footing width:
      – right one– 1.2 m
      – left one – 0.65 m
minimum clearance per height – 5.25 m
maximum depth of the tunnel – 8.5 m
maximum laying depth – 1.2 m
elevation markings:
      – min – 166.786 m
      – min per pile toe – 139.165 m
      – max per portal – 178.36 m