UNDERGROUND PASSAGE NEAR BIRZHEVOY BRIDGE ON MITNENSKAYA EMBANKMENT, SAINT PETERSBURG

Our underground passage is being located in historical area of Saint Petersburg city center within gorgeous landscape design.  The above project should provide more comfortable promenade along the Mitninskaya Embankment for local public with link to ‘Tuchkov Buyan Island’ as well ramps to be arranged for the convenience of handicaps.

The structure composed of the following:section of tunnel part
two ramps
segment of service structures

.

CLIENT

JSC ‘Vozrozhdenie’

DESIGN STAGE

2022 – 2023

CONSTRUCTION STAGE

2022 – 2024

SCOPE OF WORKS

Stages DD & WD:
general design

TECHNICAL FEATURES

Total area of the structure: – 582.1 m2
Including the following:
tunnel area -166.4 m2
ramps area – 357.5 m2
total area of service structures – 56.7 m2
air duct area (overland) – 1.5 m2
volume of service structures  – 146.4m3
stories quantity  – 1 (underground )

Leave a Comment

Your email address will not be published. Required fields are marked *